Briesen2000

Experiences with Zinc Injection at Obrigheim Nuclear Power Plant
By Ingolf BRIESEN, Obrigheim NPP, Germany

Briesen2000.pdf

Hakansson2000

Project NORDZINK – A Zinc Injection Demonstration Campaign in the Barsebäck-2 NPP
by L. Håkansson, Barsebäck NPP, K. Lundgren, ALARA Engineering, T. Åberg, Barsebäck NPP, Sweden

Hakansson2000.pdf

Zorrilla2000

LAGUNA VERDE DOSE REDUCTION PROGRAM
By S.H. Zorrilla, Laguna Verde NPP, Mexico

Zorrilla2000.pdf

Doty2000

SELECTION OF AN ANNUAL PERSON-SIEVERT(REM) GOAL WHEN PLANT CONDITIONS ARE CHANGING
By R.L. DOTY, PPL Electric Utilities Corporation, USA

Doty2000.pdf

Avetisyan_P2004

RADIATION PROTECTION IN THE DESIGN AND MODIFICATIONS OF INSTALLATIONS
By A. Avetisyan, Armanian Nuclear Regulatory Authority (ANRA), Armenia

Avetisyan_P2004.pdf

Kokubun_P2004

Comparison of occupational dose during outage between foreign countries’ and Japanese Nuclear Power Plants
By Y. Kokubun,  K. Iida, T. Watanabe, K. Sugai, K. Miyamaru / Tokyo Electric Power Company / Japan

Kokubun_P2004.pdf

Fragio_P2004

Unexpected Dose Increase at Cofrentes NPP during Refuelling Outage 14 (2003)
By R. Fragio, Cofrentes NPP, Spain

Fragio_P2004.pdf

Wang_P2004

ANALYSIS AND DISCUSSION OF OCCUPATIONAL INTERNAL EXPOSURE CAUSED BY RADON AT NPP
By H. Wang, Lingao NPP,China

Wang_P2004.pdf

Cho_P2004

Establishment and Application of a National Recording Level in Korea
bY D.H. Cho, S.H. Na, B.S. Lee, J.J. Oh, W.C. Choi, B.K. Seo / Korea Institute of Nuclear Safety (KINS) / Korea

Cho_P2004.pdf

Hovhannisyan_P2004

SEMIENPIRICAL METHOD FOR CALCULATING EQIAVALENT DOSE RATES OF NON-STANDARD OPERATIONS DURING TRANSPORTATION OF SNF IN DRY SHIELDED CANISTER
By P. Hovhannisyan, V. Atoyan, Armenian NPP, Armenia

Hovhannisyan_P2004.pdf