APPLYING ALARA FOR REPLACEMENTS OF STEAM GENERATOR FEEDWATER DISTRIBUTION PIPES AT PAKS NPP
By G. Volent, I. Metzger, Paks NPP, Hungary
Vermeulen2002
REPLACEMENT OF NEUTRON ABSORBERS IN THE SPENT FUEL POOL STORAGE FACILITY OF THE TIHANGE 3: AN ALARA APPROACH
By L. Vermeulen, Tihange NPP, Belgium
Degrange2002
ANALYSIS OF THE DOSES ASSOCIATED WITH THE SPENT FUEL SHIPMENTS FROM THE FRENCH NPPS: ARE THEY ALARA?
By J.P. Degrange, C. Benhamou, L. D’Ascenzo, CEPN / A. Leroy, EDF GPR / E. Vrignaud, EDF DC
France
European Distinguished paper in 2002.
Atoyan2002
DOSES OF THE STAFF DURING THE SPEND FUEL ASSEMBLIES TRANSPORTATION AND STORAGE IN NUHMOS 56V CONCRETE SYSTEM
By V. Atoyan, A. Muradyan, Armenian NPP, Armenia
Pletniov2002
ENHANCEMENT OF RADIOLOGICAL SAFETY CULTURE WITHIN IGNALINA NPP AND CONTRACTORS
By Viktor PLETNIOV, Ignalina NPP, Lithuania / Gintautas KLEVINSKAS, Radiation Protection Centre, Lithuania
Gonin2002
ABOUT THE INTEREST OF AN AGREEMENT FOR A EUROPEAN PASSPORT FOR WORKERS IN EUROPEAN NUCLEAR FUEL CYCLE INSTALLATIONS
By Dr M. Gonin, Dr C. Bailloeuil, Dr A. Pétrequin, Dr M. Teissier / EDF-GDF Service Central dAppui en Santé au Travail
Dr J.-M. Giraud, Dr A. Flüry-Hérard, Dr A. Miele, Dr F. Pic, Dr C. Roullet, P. Bérard / CEA-Siège
Dr B. Quesne, COGEMA
France
Andersson2002
A SWEDISH DOSE PASSPORT – CONTRACTORS POINT OF VIEW
By Mikael Andersson, Anders Holmqvist, Jan Möller, Westinghouse Atom AB, Sweden
Weeks2002
THE BNFL LEGAL ELECTRONIC DOSIMETRY SERVICE
By A.R. Weeks, M.P. Pottinger, Berkeley Center, United Kingdom / P.W. Clarke, BNFL Magnox Generation, Oldbury NPP, United Kingdom
Morris2002
CDRL – Company Dose Restriction Level
By S.N. Morris, British Energy Generation Ltd, United Kingdom
Wood2002
COMMONALITY INITIATIVES IN US NUCLEAR POWER PLANTS TO IMPROVE RADIATION PROTECTION CULTURE & WORKER EFFICIENCY
By W. David Wood and David W. Miller, D.C. Cook NPP, USA