Documents

Ohr2002

QUAD CITIES UNIT ONE COBALT-60 EXPERIENCE
By K. Ohr, Quad Cities NPP / E. Anderson, Exelon Nuclear / D. Barker, Quad Cities NPP – USA

Ohr2002.pdf

Rocher2002

Impact of Main Radiological Pollutants on Contamination Risks (ALARA)
Optimisation of Physico Chemical Environment and Retention Technics during Operation and Shutdown
By A. Rocher, EDF/GPR, J.L. Bretelle, EDF/GDL, M. Berger, EDF/SEPTEN – France

European Distinguished paper in 2002.

Rocher2002.pdf

Fredriksson2002

FUEL DECONTAMINATION AT RINGHALS 1 WITH THE NEW DECONTAMINATION PROCESS ICEDEC™
By E. Fredriksson, R. Ivars, A. Rosengren, Westinghouse, Sweden / G. Granath, Ringhals NPP, Sweden

European Distinguished paper in 2002.

Fredriksson2002.pdf

Terry2002

STEAM GENERATOR REPLACEMENT FROM ALARA ASPECTS
By I. Terry, Framatome ANP, Germany / B. Breznik, Krško NPP, Slovenia

Terry2002.pdf

Volent2002

APPLYING ALARA FOR REPLACEMENTS OF STEAM GENERATOR FEEDWATER DISTRIBUTION PIPES AT PAKS NPP
By G. Volent, I. Metzger, Paks NPP, Hungary

Volent2002.pdf

Vermeulen2002

REPLACEMENT OF NEUTRON ABSORBERS IN THE SPENT FUEL POOL STORAGE FACILITY OF THE TIHANGE 3: AN ALARA APPROACH
By L. Vermeulen, Tihange NPP, Belgium

Vermeulen2002.pdf

Degrange2002

ANALYSIS OF THE DOSES ASSOCIATED WITH THE SPENT FUEL SHIPMENTS FROM THE FRENCH NPPS: ARE THEY ALARA?
By J.P. Degrange, C. Benhamou, L. D’Ascenzo, CEPN / A. Leroy, EDF GPR / E. Vrignaud, EDF DC
France

European Distinguished paper in 2002.

Degrange2002.pdf

Atoyan2002

DOSES OF THE STAFF DURING THE SPEND FUEL ASSEMBLIES TRANSPORTATION AND STORAGE IN NUHMOS 56V CONCRETE SYSTEM
By V. Atoyan, A. Muradyan, Armenian NPP, Armenia

Atoyan2002.pdf

Pletniov2002

ENHANCEMENT OF RADIOLOGICAL SAFETY CULTURE WITHIN IGNALINA NPP AND CONTRACTORS
By Viktor PLETNIOV, Ignalina NPP, Lithuania / Gintautas KLEVINSKAS, Radiation Protection Centre, Lithuania

Pletniov2002.pdf

Gonin2002

ABOUT THE INTEREST OF AN AGREEMENT FOR A EUROPEAN PASSPORT FOR WORKERS IN EUROPEAN NUCLEAR FUEL CYCLE INSTALLATIONS
By Dr M. Gonin, Dr C. Bailloeuil, Dr A. Pétrequin, Dr M. Teissier / EDF-GDF Service Central d’Appui en Santé au Travail
Dr J.-M. Giraud, Dr A. Flüry-Hérard, Dr A. Miele, Dr F. Pic, Dr C. Roullet, P. Bérard / CEA-Siège
Dr B. Quesne, COGEMA
France

Gonin2002.pdf