Published on 19 July 2012 By Lucie D'Ascenzo 1935 downloads
Brunk2012_ppt.pdf
System decontamination of two BWR units performed during 2011 and 2012By J. Brunk, Forsmark NPP, Sweden
Published on 19 July 2012 By Lucie D'Ascenzo 2193 downloads
Hort2012_ppt.pdf
ALARA in Practice – Reactor internal parts repair at the Temelín NPPBy M. Hort (State Office for Nuclear Safety), J. Koc, O. Kvasnička (Temelin NPP), P. Zapletal (Škoda JS), Czech Republic
Published on 19 July 2012 By Lucie D'Ascenzo 1580 downloads
Renn2012_ppt.pdf
Operational Experience during the replacement of Pressuriser Heaters in Forced & Planned OutagesBy G. Renn, M. Lunn, Sizewell B NPP, United KingdomDistinguished Paper at the 2012 ISOE European Symposium (Prague, Czech Republic)
Published on 19 July 2012 By Lucie D'Ascenzo 3338 downloads
Stiepani2012_ppt.pdf
Primary System Decontamination of the German PWR Grafenrheinfeld – Process Application and Recontamination ExperienceBy B. Stellwag (AREVA NP GmbH), S. Schütz, A. Jacob (Grafenrheinfeld NPP), C. Stiepani, C. Topf (AREVA NP GmbH), Germany